Powered By Kitlog Pro v2.0
Beyond Blue
Cozy MKIV
Chapter 6: Fuselage
12-26-2017
< Previous Log Entry
Next Log Entry >
Date:
12-26-2017
Number of Hours:
2.50
Manual Reference:
Chapter 6
Brief Description:
Sanding bottom of seatback and IP
This sandpaper should last for awhile.
Sanded bottom of the front seatback flush with the bottom longerons and the heat duct.
Sanded the bottom of the instrument panel flush with the bottom longerons and the heat duct.
Lastly, sanded the instrument panel and seatback where the seat brace and heat duct will be installed.
Ready for permanent seat brace and heat duct assembly installation.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Cozy MKIV Home
Cozy MKIV Home
Category
# Logs
# Hours
All
450
903
Chap 14: Centresecti
1
10
Chap 3 : Training
17
58
Chap 4 : Bulkheads
116
180
Chap 5: Fuselage Sid
79
128
Chapter 6: Fuselage
113
215
Chapter 7: Fuselage
46
116
Chapter 8
30
64
Miscellaneous
9
3
Other Cozy Projects
1
1
Tools
3
10
Training & Preparati
17
58
Training & Setup
17
58
Wings
1
2
Copyright © 2001-2024 Matronics. All Rights Reserved.