Powered By Kitlog Pro v2.0
Beyond Blue
Cozy MKIV
Chapter 6: Fuselage
12-24-2017
< Previous Log Entry
Next Log Entry >
Date:
12-24-2017
Number of Hours:
2.00
Manual Reference:
Brief Description:
Trim and Sand Seat Brace and Heat Duct
Removed peel ply from the 2" BID tape on the seat brace/heat duct joint.
Trimmed the fiberglass edges using a small hand saw.
Sanded the taped joint and vacuumed the assembly and work table.
Sanded the bottom of the heat duct flush with the lower fuselage longerons.
Temporarily clamped 2 x 4s across the bottom of the fuselage to ensure the bottom of the heat duct was level with the longerons.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Cozy MKIV Home
Cozy MKIV Home
Category
# Logs
# Hours
All
450
903
Chap 14: Centresecti
1
10
Chap 3 : Training
17
58
Chap 4 : Bulkheads
116
180
Chap 5: Fuselage Sid
79
128
Chapter 6: Fuselage
113
215
Chapter 7: Fuselage
46
116
Chapter 8
30
64
Miscellaneous
9
3
Other Cozy Projects
1
1
Tools
3
10
Training & Preparati
17
58
Training & Setup
17
58
Wings
1
2
Copyright © 2001-2024 Matronics. All Rights Reserved.