KitLog pro

Powered By Kitlog Pro v2.0

Beyond Blue
' style=
Date:  12-29-2018
Number of Hours:  3.00
Manual Reference:  step 2
Brief Description:  NACA Scoop & Fuselage Bottom

Repaired some areas of the NACA scoop between the landing gear bulkheads where there were air bubbles after the 2-ply BID layup. Injected epoxy for the smaller air bubbles and sanded and patched one other spot.

Continued rounding the bottom corners of the fuselage to shape.

Marked a 1" wide area forward of the landing brake and a 2" wide area alongside and aft of the landing brake.

Fabricated a 1" x 2" sanding block for making a 1/16 " depression around the landing brake.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.