Powered By Kitlog Pro v2.0
Beyond Blue
Cozy MKIV
All
1-25-2020
< Previous Log Entry
Next Log Entry >
Date:
1-25-2020
Number of Hours:
2.00
Manual Reference:
Step 7
Brief Description:
Glass Aft Heat Duct
Trim, sand, and vacuum the aft heat duct.
Cut 2-ply BID cloth @ 45 deg orientation and a piece of peel ply to cover the layup.
Workshop temperature 24 deg C and 40% humidity.
A batch of epoxy was mixed using 188g resin and 72g hardner.
Epoxy was brushed onto the top glassed portion of the heat duct.
A batch of micro was mixed and applied to the foam surfaces of the heat duct.
A small batch of dry micro was applied where the top surface meets the ramp at the rear of the heat duct.
Two layers of BID cloth were applied on with epoxy, followed by peel ply.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Cozy MKIV Home
Cozy MKIV Home
Category
# Logs
# Hours
All
450
903
Chap 14: Centresecti
1
10
Chap 3 : Training
17
58
Chap 4 : Bulkheads
116
180
Chap 5: Fuselage Sid
79
128
Chapter 6: Fuselage
113
215
Chapter 7: Fuselage
46
116
Chapter 8
30
64
Miscellaneous
9
3
Other Cozy Projects
1
1
Tools
3
10
Training & Preparati
17
58
Training & Setup
17
58
Wings
1
2
Copyright © 2001-2024 Matronics. All Rights Reserved.