KitLog pro

Powered By Kitlog Pro v2.0

Beyond Blue
' style=
Date:  11-3-2018
Number of Hours:  1.50
Manual Reference:  Step 1
Brief Description:  Install Aluminum Inserts

Radius the corners around the joggle so that the BID cloth will better fit into the joggles.

Workshop temperature 24 deg C and humidity 51%.

A small batch of flox was mixed using 32g resin and 12g hardner.

Flox was placed inside each aluminum insert location and the inserts were installed flush with the landing gear bulkheads.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.