Powered By Kitlog Pro v2.0
Beyond Blue
Cozy MKIV
All
11-3-2018
< Previous Log Entry
Next Log Entry >
Date:
11-3-2018
Number of Hours:
1.50
Manual Reference:
Step 1
Brief Description:
Install Aluminum Inserts
Radius the corners around the joggle so that the BID cloth will better fit into the joggles.
Workshop temperature 24 deg C and humidity 51%.
A small batch of flox was mixed using 32g resin and 12g hardner.
Flox was placed inside each aluminum insert location and the inserts were installed flush with the landing gear bulkheads.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Cozy MKIV Home
Cozy MKIV Home
Category
# Logs
# Hours
All
450
903
Chap 14: Centresecti
1
10
Chap 3 : Training
17
58
Chap 4 : Bulkheads
116
180
Chap 5: Fuselage Sid
79
128
Chapter 6: Fuselage
113
215
Chapter 7: Fuselage
46
116
Chapter 8
30
64
Miscellaneous
9
3
Other Cozy Projects
1
1
Tools
3
10
Training & Preparati
17
58
Training & Setup
17
58
Wings
1
2
Copyright © 2001-2024 Matronics. All Rights Reserved.