Powered By Kitlog Pro v2.0
Beyond Blue
Cozy MKIV
All
2-1-2020
< Previous Log Entry
Next Log Entry >
Date:
2-1-2020
Number of Hours:
1.00
Manual Reference:
Step 7
Brief Description:
Install Transition Piece in Aft Heat Duct
Removed the peel ply and trimmed the excess fiberglass from the aft heat duct.
Drilled the seatbelt anchor holes out.
Sanded the aft heat duct then cut a hole in the top of the heat duct for the transition piece.
Workshop temperature 20 deg C and 41% humidity.
Mixed 12g resin and 4g hardner with some flox to make a thick batch of flox.
Flox'd the transition piece in place.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Cozy MKIV Home
Cozy MKIV Home
Category
# Logs
# Hours
All
450
903
Chap 14: Centresecti
1
10
Chap 3 : Training
17
58
Chap 4 : Bulkheads
116
180
Chap 5: Fuselage Sid
79
128
Chapter 6: Fuselage
113
215
Chapter 7: Fuselage
46
116
Chapter 8
30
64
Miscellaneous
9
3
Other Cozy Projects
1
1
Tools
3
10
Training & Preparati
17
58
Training & Setup
17
58
Wings
1
2
Copyright © 2001-2024 Matronics. All Rights Reserved.