KitLog pro

Powered By Kitlog Pro v2.0

Beyond Blue
' style=
Date:  10-6-2017
Number of Hours:  3.00
Manual Reference:  
Brief Description:  Flox heat duct together

Drilled holes through the fiberglass in the triangular braces for the aluminum tube.

Used 5 minute epoxy to put the top pieces of the heat duct together.

Clamped the 3 heat duct pieces to a 2 x 4 for trial fit before floxing. This took awhile to get the pieces oriented and aligned correctly.

Shop temperature set to 25 deg C and humidity 52%.

40g resign and 15.2g hardner mixed with flox and applied to the heat duct to secure the sides to the top. Curing in progress.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.