KitLog pro

Powered By Kitlog Pro v2.0

Beyond Blue
' style=
Date:  10-31-2015
Number of Hours:  1.00
Manual Reference:  
Brief Description:  Install 20.5" doublers

Shop temperature was 24 deg C and humidity was 42%.

The mating surfaces of the doublers and longersons were vacuumed.

Flox was mixed: 48g resin, 18g hardner, flox.

Two 20.5" long doublers were installed with flox at the aft end of the bottom longeron on both fuselage sides.

The longerons were held in place using clamps and nails in pre-drilled holes.

Excess epoxy was wiped away.

Nails to be removed prior to full cure.
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.