Date:  2-1-2015
Number of Hours:  1.50
Manual Reference:  Chap 5 Step 2
Brief Description:  Installed bottom right side spacers

Workshop was heated to 25 deg C and the humidity was less than 30%.

I used 2 batches of micro-slurry for this. Each batch consisted of 36g resin, 14g hardner, and 1 scoop of glass bubbles.

I applied the micro to the PVC foam using a squeegee then I applied micro to the bottom of the spacers. Starting at the aft end and working towards the front, I applied nails into the foam to temporarily hold it in place and to follow the shape of the bottom of the right fuselage side. I used books between the nails to weigh down the spacers while they cure.