KitLog pro

Powered By Kitlog Pro v2.0

Beyond Blue
' style=
Date:  11-22-2014
Number of Hours:  1.50
Manual Reference:  Chapter 5 Step 2
Brief Description:  Sand & 30 degree lines

I sanded the hardened 5 minute epoxy where the foam pieces were epoxy'd together. I vacuumed the foam fuselage sides after sanding.

I added 30 degree lines to show the directions for placing the 1st and 2nd layers of glass cloth.

Lastly Sophie and I cleaned up the shop floor.

Sophie is either a QA inspector or Sherlock Holmes ???
' style=

30 degree lines

30 degree lines

' style=

QA Inspection of bulkheads

QA Inspection of bulkheads

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.