I sanded the forward landing gear bulkhead bottom half and confirmed the shape against drawing M-5. Next I located the position to drill the 1/4 in hole in each hardpoint. Using the location of the 1/4 in hole as drawn on M-5 or with the template made from M-5 doesn't match the dimensions written on M-5 for these locations. I went with the written dimensions rather than the location where the holes are drawn. Using a drill press I drilled a 1/4 in hole in each hardpoint.
Once the aft side layup had cured 3 air bubbles remained (2 on one hardpoint and 1 on the other). I drilled a very small entry and exit hole in each air bubble and I'll fill it with epoxy.