KitLog pro

Powered By Kitlog Pro v2.0

Beyond Blue
' style=
Date:  10-15-2011
Number of Hours:  1.50
Manual Reference:  Chapter 4
Brief Description:  Finished 2 of the 3 landing gear bulkheads

The 3 beveled edges of the forward landing gear bulkhead top half were trimmed using both a hack saw and an electric handsaw. All edges were sanded. The bulkhead was vacuumed.

This piece is now complete as far as Chapter 4 goes. Other builders sites recommend leaving the holes to be drilled until after installation of this piece in a subsequent chapter. By waiting, this provides better alignment of the torque tube holes through the bulkheads.

I hung the finished bulkhead on the shop wall with the instrument panel.

The aft landing gear bulkhead was sanded then vacuumed and stored away.
' style=

cutting beveled edges

cutting beveled edges

' style=

fwd (top) gear bulkhead stored away

fwd (top) gear bulkhead stored away

' style=

Aft landing gear bulkhead

Aft landing gear bulkhead

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.