KitLog pro

Powered By Kitlog Pro v2.0

Beyond Blue
' style=
Date:  11-19-2010
Number of Hours:  2.00
Manual Reference:  Chapter 4
Brief Description:  Instrument Panel - Aft Layup Preparations

Foam dust and foam pieces were swept up and vacuumed from the shop floor and work table. The instrument panel foam shape was vacuumed to remove the loose dust. Plastic was layed out on the worktable, cups labelled, stir sticks, brushes, and squeegees layed out.

2 plies of BID @ 45 degrees were cut; 1 ply UND cut; peel ply and wax paper cut to size; labels added to the cloth.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.