Powered By Kitlog Pro v2.0
ALAN'S WEB SITE
RV-9A
Fuselage
11-29-2008
< Previous Log Entry
Next Log Entry >
Date:
11-29-2008
Number of Hours:
5.00
Manual Reference:
Brief Description:
Flap Actuator
Completed the flap actuator assembly. Installed the flap actuator and connected it to the weldment. (I didn't safety wire the actuator. I will be removing it to install the elevator pushrod assembly.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
903
1811
Avionics
42
63
Canopy
93
207
Cowling
29
69
Electrical
102
171
Empennage
133
311
Engine
90
178
Firewall Forward
35
59
Fuselage
170
342
Inspection
15
38
Miscellaneous
46
44
None
4
0
Panel
49
121
Prop
24
38
Tools
2
4
Wings
69
166
Copyright © 2001-2024 Matronics. All Rights Reserved.