KitLog pro

Powered By Kitlog Pro v2.0

Chuck S. Sportsman 2 +2 Site
< Previous Log Entry          Next Log Entry >
' style=
Date:  9-26-2006
Number of Hours:  3.50
Manual Reference:  
Brief Description:  Wing Assembly and Pitot Static System

Wing Assembly -reviewed the wing construction portion of the construction manual for any steps omitted by the factory. Secitons omitted include Step 37, Step 39, and the pitot Static OptionPitot Static System -located parts kit for the system, reviewed the parts list, tools list, general notes, option -steps 1 thru 12 regarding the pitot mast installation -assembled parts and tools required to begin installation of the pitot mast-confirmed with Sean that a pitot mast mounting doubler was already installed by the factory-marked center and alignment lines as required to position the mast on the wing as detailed-established a layout for the area to be removed from the lower wing skin to accommodate installation of the mast. -removed about 95 percent of the layout area
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.