KitLog pro

Powered By Kitlog Pro v2.0

Chuck S. Sportsman 2 +2 Site
' style=
Date:  9-12-2006
Number of Hours:  8.00
Manual Reference:  
Brief Description:  Fuse Step 7 - 10

Section 8, Step 7-10, Fabricating Upper, Lower, Aft, and Forward, Shell Attach Fittings/BracketsExecuted construction details specified in the manual for the shell attach bracketsFabrication of these brackets included; -establishing a layout for rivet holes (as detailed), then drilling of the holes to No 40 (pilot size)-establishing a layout for shaping (as detailed) , then cutting, shaping, and finishing edges
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.