KitLog pro

Powered By Kitlog Pro v2.0

Scotts Kitfox Sport project
' style=
Date:  8-24-2003
Number of Hours:  5.20
Manual Reference:  
Brief Description:  R/H wing fabric covering.

I calibrated the iron. Then with it set at 250 deg, I began working over the cemented areas to smooth out the wrinkles and bumps.This wasn't as easy as I thought. The wrinkles are very difficult to smooth out. I'll do a better job in the future to avoid wrinkles as I bond the fabric in place.With all the wrinkles now worked out, the top is now ready for fabric installation.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.