Disassembled lift strut support from spar. Deburred all holes. And prepared faying surfaces for structural adhesive bonding. Mixed up a batch of Hysol and applied to mating surface. Then installed strut support on wing spar using stainless steel rivets. And cleaned up excess epoxy.