Drilled up remaining holes per flag note 1. Disassembled and deburred parts. Prepared part for structural epoxy bonding. Mixed up a batch of Hysol and applied to faying surface. Then riveted strut support in place with stainless steel rivets.And cleaned up excess epoxy squeeze out.