Disassembled and deburred R/H fwd lift strut bracket. Prepared mating surfaces for structural adheasive bonding. Mixed a batch of Hysol epoxy for bonding. Applied to faying surface and clecoed in place. Then riveted strut bracket to spar and cleaned up excess epoxy.