KitLog pro

Powered By Kitlog Pro v2.0

Scotts Kitfox Sport project
' style=
Date:  4-19-2003
Number of Hours:  6.20
Manual Reference:  72
Brief Description:  Door frame installation.

Fabricated three door frame angles for R/H door. Located angles, drilled, deburred, and countersunk for proper fit. Then riveted the three angles together prior to installation. Cleaned surfaces for epoxy bonding and bonded parts to structure.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.