KitLog pro

Powered By Kitlog Pro v2.0

Kurt Haller RV-9A
' style=
Date:  7-15-2012
Number of Hours:  9.00
Manual Reference:  
Brief Description:  Fuel vent lines, fuel valve & brake resvr spcrs

Bent and installed fuel tank vent lines, both sides. Machined spacers for fuel select valve from Al tube on the lathe. Removed elevator trim bracket from the fuel valve plate, installed the plate w/valve into the fuse.

Installed brake fluid reservoir on the firewall, using stnlss spacers machined on the lathe. Decided to follow the Bingelis advice to use netplates wherever possible. It was possible!
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.