Brief Description: Bolted LG wldmts for good. Began fuel/brake lines
Removed, cleaned, spot primed the main landing gear weldments. Installed them "permanently", torqueing the bolts putting on the inspection lacquer. Installed, torqued, sealed the brake line AN bulkhead fitting. Made a 90 deg bend on the right fuel line, flared it, and threaded the tube through the bushings and gussets out to the right side of the fuse. The last double bend, from the rightmost LG wldmt gusset to the fuse side exit is a rhymes with witch for sure!