Powered By Kitlog Pro v2.0
Kurt Haller RV-9A
Vans RV-9A
Fuselage
2-11-2012
< Previous Log Entry
Next Log Entry >
Date:
2-11-2012
Number of Hours:
6.80
Manual Reference:
8
Brief Description:
Misc f/w deburr, cskng, drilling.
Deburred f/w flange #40 holes.
Csk all fwd fuse frame members as needed.
Drilled F-684 gussets for platenuts.
Opened vent line to 3/4" for rubber grommets on landing gear web. Enlarged the fuel line holes in the web to 1" with fly cutter.
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
Vans RV-9A Home
Category
# Logs
# Hours
All
636
2839
Avionics
22
98
Canopy (slider)
12
81
Cowl
4
5
Electrical
7
32
Empennage
95
377
Engine
22
144
Finish
54
231
Flight
6
Fuselage
188
815
Landing Gear
6
34
Miscellaneous
7
56
None
4
Panel
4
Paperwork
1
1
Prop
2
Tools
3
Wings
199
965
Copyright © 2001-2024 Matronics. All Rights Reserved.