11/13/18 Received parts from ASS 2.6 Hours Drilled 1 1/8" holes in center console for USB charging plug and cigerate lighter. Temp screwed left side panel and top together. Laylout brake cable to brake valve Cut cable to length. Moved shelter and work table two feet towards rear of hangar to give room to move fuselage into shelter. Tiddied.
11/14/18 Received repacement inst panel (aaugh, instrument back plate missing) and throttle bracket from Zenith. Received data USB panel mount from Dynon and received clear heat srink tubing from Amazon. 1.7 Hours Located and drilled screw holes in side panel of center console for brake line clamps. DG8 clamps too large and DG6 too small. Will order DG7s.
11/15/18 Moved fuselage into shelter for the winter. 2.6 Hours Used old instrument panel to locate the throttle that I wanted, about 1 1/2" to right of the predrilled location. Shortened throtle cable 3/4" for new location. Marked then cut-out hole for USB data plug in center console.