Brief Description: Service Bulletin October 11 2018
6/28/19 4.0 Hours Make backing plates for the two fuel line elbows at the fuselage wing root and installed them. Continued with the Service Bulletin October 11 2018 work back drilling through the new 8 ft elevator hinge,
6/29/19 3.3 Hours Continued with Service bulletin. Finished eleavator hinge. Moved stab to table and removed the 69 rivets and hinge. Marked the rivets that have to be removed for the skin doubler. Brought the elevator to stab and test mated the hinge. Have to think of a way to remove hinge pin if need be.