After a 1 year 4 day hiatus I managed to clean off the workbench (huge pile of junk), vacuum the dust, and pick up where I left off. Check out the Monerai log to see what I've been up to since the last log entry. All of the bottom skins are now drilled and in their respective places. The PF-188 mounts fit through their holes I drilled/filed through the bottom skin. The rear PF-157D braces were also drilled and cleco'd. Next up are the PF-157A/B/C braces and the landing gear mounting brackets. I found tha predrilling the holes on the P-157D braces and using neodymium magnets to hold them in place for the first couple of holes helped tremendously.