KitLog pro

Powered By Kitlog Pro v2.0

JOHN'S WEB SITE
' style=
Date:  6-25-2019
Number of Hours:  4.50
Manual Reference:  
Brief Description:  Landing gear

Worked on main gear operation. Built up inside of right socket with expoxy/flox. The left socket had to be moved to make the camber the same on both gear. It was installed off slightly at the factory. This meant the right socket needed to be built up to properly contain the gear.
' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.