Continued chapter 21. Riveting the step ribs. Riveting the right fuselage corner skins. Installed snap bushings. Installed the fuel bulkhead fitting in the F-1204D center section bulkhead (28-06 step1).
After installing the SB500-6 snap bushings I took the dremel to make the bushings wider to accept the fuel line.