KitLog pro

Powered By Kitlog Pro v2.0

Joels Web Site
' style=
Date:  2-1-2006
Number of Hours:  3.00
Manual Reference:  L01
Brief Description:  Landing Gear Installation

I rigged the landing gear legs and drilled the upper bolt holes through the gear legs and motor mount tubes. I took me about 2.5 hours to get everything rigged to my satisfaction and about 30 minutes to drill the holes. I am glad to be done with drilling titanium.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.