Work Logs Found: 254
Category Work Time: 975 Hours
 Date
Hours
Work Log Summary

Details

 01-13-2007
0.25
First Flight!
       

 12-09-2006
2.00
Airworthiness Inspection
Details

 10-30-2006
4.00
Finished FAA Paperwork
Details

 10-21-2006
5.00
Weight and Balance
Details
       

 10-14-2006
2.00
Fixed oil leak at oil pump
Details
     

 10-01-2006
3.00
Miscellaneous
Details

 09-30-2006
2.00
Mag Switch Rewire
Details

 09-26-2006
3.00
Ventral Fin Installation
Details
     

 09-24-2006
4.00
First Engine Run
Details
     

 09-23-2006
5.00
Prop Install and Fuel Sender Calibration
Details
     

 09-16-2006
4.00
Electronic Ignition
Details

 09-02-2006
5.00
Cooling Baffle Seals
Details

 08-30-2006
5.00
Cowling Installation
Details

 08-27-2006
5.00
Cowling Installation
Details
     

 08-22-2006
25.00
Cowling Installation
Details

 08-01-2006
4.00
Wheel Pants
Details

 07-31-2006
4.00
Engine Installation
Details

 07-30-2006
6.00
Cowling Installation
Details
     

 07-29-2006
5.00
Cowling Installation
Details

 07-25-2006
3.00
Cowling Installation
Details

 07-22-2006
2.00
Install Aft Bottom Skin
Details

 07-21-2006
1.50
Wheel Pants
Details
     

 07-20-2006
1.00
Wheel Pants
Details

 07-16-2006
2.00
Wheel Pants
Details

 07-13-2006
3.00
Misc
Details
     

 07-12-2006
6.00
Landing Gear Fairings
Details

 07-11-2006
7.00
Engine Wiring and Landing Gear Fairings
Details

 07-09-2006
6.00
Engine Installation
Details

 07-08-2006
6.00
Engine Installation
Details

 07-03-2006
6.00
Cooling Baffles
Details
       

 06-28-2006
3.00
Engine Installation
Details
     

 06-27-2006
3.00
Control System
Details
     

 06-20-2006
3.00
Cooling Baffles
Details

 05-31-2006
2.00
Gear Leg Fairings
Details

 05-30-2006
4.00
Wheel Pants and Gear Leg Fairings
Details

 05-29-2006
5.00
Misc Stuff
Details

 05-16-2006
4.00
Wing and Control Surface Installation
Details
     

 05-15-2006
4.00
Move plane to hangar
Details
       

 04-29-2006
10.00
Avionics and Electrical
Details
     

 04-23-2006
8.00
Canopy Installation
Details
     

 04-16-2006
20.00
Windshield and Canopy Installation
Details
       

 04-09-2006
8.00
Windshield and Canopy Installation
Details

 04-06-2006
8.00
Fuel System Installation
Details
       

 03-28-2006
12.00
Miscellaneous Stuff
Details

 03-19-2006
6.00

Details
     

 03-18-2006
2.00


 03-16-2006
2.00
Battery Box Installation
Details
     

 03-13-2006
4.00
Battery Box
Details

 03-12-2006
2.00
Miscellaneous Wing Stuff
Details

 03-10-2006
8.00
Fuselage Complete
Details
       

 03-07-2006
2.00
Misc
Details

 03-06-2006
2.00
Misc.
Details

 03-05-2006
6.00
Misc Riveting and Stuff
Details

 03-04-2006
3.00
Wing Installation
Details

 03-01-2006
3.00
Wing Rigging
Details

 02-26-2006
6.00
Wing Installation and Rigging
Details

 02-25-2006
2.00
Wing Installation and Rigging
Details
       

 02-23-2006
1.00
Registration Paperwork
Details

 02-22-2006
1.50
Tailwheel Installation
Details

 02-21-2006
4.00
Stuff
Details

 02-12-2006
3.00
Rear Spar Carrythrough
Details

 02-11-2006
3.00
Rear Spar Carrythrough and Misc
Details

 02-05-2006
5.00
Landing Gear Installation and Misc
Details
     

 02-04-2006
8.00
Priming and Painting
Details

 02-03-2006
3.00
Landing Gear Installation
Details

 02-01-2006
3.00
Landing Gear Installation
Details
     

 01-29-2006
3.00
Main Landing Gear Installation
Details

 01-28-2006
1.00
Motor Mount Installation
Details

 01-28-2006
9.00
Main Landing Gear Installation
Details

 01-25-2006
5.00
Motor Mount Installation
Details

 01-22-2006
2.00
Motor Mount Installation
Details

 01-21-2006
3.00
Instrument Panel & Glareshield Installation
Details

 01-17-2006
2.50
Instrument Panel & Glareshield Installation
Details
     

 01-16-2006
3.00
Glareshield & Instrument Panel Installation
Details

 01-15-2006
6.00
Glareshield and Intrument Panel Details
Details

 01-14-2006
5.00
Seat Installation
Details
       

 01-03-2006
2.50
Seat Installation
Details

 01-02-2006
3.00
Seat Installation
Details

 01-01-2006
6.00
Aft Lower Cabin Details Installation
Details
     

 12-31-2005
3.00
Aft Lower Cabin Details Installation
Details
     

 12-27-2005
3.00
Aft Lower Cabin Details Installation
Details

 12-26-2005
3.00
Aft Lower Cabin Details
Details

 12-21-2005
5.00
Aft Lower Cabin Details
Details

 12-20-2005
4.00
Aft Lower Cabin Details
Details

 12-14-2005
3.00
Rudder Assembly
Details

 12-12-2005
2.00
Rudder Details
Details

 12-11-2005
6.00
Fuselage Box Assembly
Details
       

 12-08-2005
3.00
Fuselage Box Assembly
Details

 12-08-2005
2.00
Fuselage Box Assembly
Details

 12-07-2005
3.50
Fuselage Box Assembly
Details

 12-06-2005
4.00
Fuselage Box Assembly
Details

 12-04-2005
6.50
Fuselage Box Assembly
Details

 12-01-2005
2.00
Fuselage Box Assembly
Details

 11-30-2005
2.00
Fuselage Box Assembly
Details

 11-28-2005
2.00
Fuselage Box Assembly
Details

 11-27-2005
7.00
Fuselage Side Panels
Details
       

 11-26-2005
5.00
Fuselage Side Panel
Details

 11-25-2005
5.00
Fuselage Side Panels
Details

 11-21-2005
2.00
Fuselage Side Panels
Details

 11-20-2005
1.50
Fuselage Side Panels
Details
     

 11-19-2005
10.00
Fuselage Side Panels
Details

 11-13-2005
4.00
Fwd Side Panel Longerons and Skins
Details

 11-12-2005
5.00
Fwd Side Panel Verticals and Gussets
Details

 11-10-2005
1.50
Fwd Side Panel Verticals and Gussets
Details

 11-08-2005
1.50
Fwd Side Panel Verticals and Gussets
Details

 11-07-2005
2.00
Fwd Side Panel Verticals and Gussets
Details

 11-06-2005
5.00
Fwd Side Panel Misc. Details
Details

 11-05-2005
5.00
Fwd Side Panel Misc. Details
Details

 11-02-2005
1.50
Fwd Side Panel Misc. Details

 11-01-2005
3.00
Fwd Side Panel Misc. Details

 10-31-2005
2.00
Lower Skin & Spar Tunnel Details
Details

 10-30-2005
7.00
Lower Skin & Spar Tunnel Details - Upper Firewall
Details

 10-26-2005
2.50
Fuselage Detail Parts
Details

 10-25-2005
2.50
Upper Firewall and Details
Details

 10-24-2005
2.00
Upper Firewall
Details

 10-23-2005
4.00
Tail Surface Installation
Details
       

 10-23-2005
6.00
Firewall and Details
Details
       

 10-22-2005
9.00
Ventral Fin, Tail Wheel Installation, Tail Fairin
Details
       

 10-18-2005
3.00
Rudder Details and Ventral Fin
Details

 10-17-2005
7.50
Stabilator Installation
Details
       

 10-16-2005
7.50
Ruddervator Assembly and Tail Tips
Details
       

 10-14-2005
4.00
Ruddervator Details and Ruddervator Assembly
Details

 10-13-2005
3.00
Ruddervator Assembly
Details
     

 10-12-2005
3.00
Stabilator Assembly Ruddervator Details
Details
     

 10-11-2005
2.00
Stabilator Assembly
Details

 10-10-2005
3.00
Stabilator Assembly
Details

 10-09-2005
5.00
Stabilator Assembly
Details
       

 10-08-2005
5.00
Stabilator Assembly
Details

 10-06-2005
3.00
Stabilator Substructure
Details
     

 10-05-2005
3.00
Stabilator Substructure
Details
     

 10-04-2005
2.00
Stabilator Substructure
Details

 10-03-2005
3.00
Stabilator Substructure
Details

 10-02-2005
3.00
Stabilator Substructure
Details

 09-28-2005
2.00
Stabilator Details
Details

 09-26-2005
2.00
Stabilators
Details

 09-25-2005
8.00
Stabilator Details
Details
     

 09-24-2005
4.00
Stabilator Details
Details

 09-24-2005
0.50
EAA Technical Counselor Inspection
Details

 09-24-2005
4.00
Aft Fuselage
Details
       

 09-22-2005
4.00
Turtledeck Installation
Details

 09-20-2005
3.00
Turtledeck Installation
Details
     

 09-19-2005
4.00
Turtledeck Installation
Details

 09-18-2005
7.00
Turtledeck Installation
Details

 09-17-2005
4.00
Turtledeck Installation
Details

 09-14-2005
4.00
Turtledeck Details
Details
     

 09-13-2005
1.00
Tailcone Box
Details
       

 09-11-2005
5.50
Tailcone Box
Details

 09-10-2005
3.50
Tailcone Box
Details

 08-29-2005
3.00
Tailcone Box
Details
     

 08-28-2005
5.00
Tailcone Box
Details

 08-27-2005
4.00
Y Fitting
Details

 08-24-2005
2.00
Mixer Mount
Details

 08-23-2005
3.00
Mixer Mount
Details

 08-22-2005
4.00
Mixer Mount
Details
     

 08-21-2005
4.00
Fuselage Side Panels
Details
       

 08-17-2005
2.50
Fuselage Side Skins and Side Panels
Details

 08-16-2005
2.00
Pulley Brackets
Details

 08-10-2005
3.00
Right Wing
Details
     

 08-09-2005
3.00
Right Wing
Details

 08-08-2005
3.00
Right Wing
Details

 08-07-2005
6.00
Rear Spar Repair
Details

 08-05-2005
2.00
Pitot Tube Installation
Details

 08-04-2005
2.00
Pitot Tube Installation
Details

 07-10-2005
35.00
Wing Box Structure
Details
       

 07-08-2005
3.00
Wing Skins
Details

 07-07-2005
4.00
Wing Skins
Details

 07-06-2005
5.00
Wing Structure and root ribs
Details

 07-04-2005
5.00
Wing Structure
Details

 07-02-2005
3.00
Wing Structure
Details

 07-01-2005
5.00
Wing Structure
Details

 06-27-2005
4.00
Flaps
Details
       

 06-26-2005
1.00
Flaps
Details

 06-19-2005
4.00
Flaps
Details

 06-05-2005
2.00
Flaps
Details

 05-21-2005
6.00
Ailerons

 05-15-2005
6.00
Ailerons
Details
       

 05-14-2005
8.00
Ailerons
Details

 05-11-2005
2.00
Ailerons
Details

 05-10-2005
1.00
Ailerons
Details

 05-10-2005
2.00
Ailerons
Details
     

 05-08-2005
6.00
Ailerons
Details
       

 05-07-2005
3.00
Ailerons
Details

 05-01-2005
5.00
Aileron Bellcranks and Ailerons
Details
     

 04-30-2005
3.00
Aileron Bellcrank Assemblies
Details

 04-24-2005
3.00
Fore and Aft Rib Assemblies
Details

 04-23-2005
5.00
Fore and Aft Rib Assemblies
Details

 04-04-2005
3.00
Aileron Bellcrank Assemblies
Details

 04-03-2005
3.00
Aileron Bellcrank Assemblies
Details

 04-02-2005
3.00
Aileron Bellcrank Assemblies
Details

 03-27-2005
1.00
Aileron Bellcrank Assembly
Details

 03-26-2005
4.00
Aileron Bellcrank Assembly
Details

 03-20-2005
5.00
Ribs
Details

 03-13-2005
2.00
Main Spars Complete
Details
       

 03-13-2005
0.10
Main Spars Complete
     

 02-13-2005
1.50
Riveting Main Spars
Details

 02-09-2005
1.00
Riveting Main Spars
Details

 02-02-2005
2.00
Riveting Main Spars
Details

 01-18-2005
12.00
Main Spars
Details

 01-03-2005
2.00
Main Spars
Details

 01-01-2005
2.00
Main Spars
Details

 12-29-2004
8.00
Main Spar
Details
       

 12-26-2004
2.00
Main Spar
Details

 12-25-2004
5.00
Main Spar
Details

 12-12-2004
4.00
Main Spar Assembly
Details

 12-11-2004
4.00
Main Spar Assembly
Details

 12-08-2004
2.00
Main Spar Assembly
Details

 11-28-2004
6.00
Main Spar Assembly
Details
       

 11-26-2004
4.00
Main Spar Assembly
Details
       

 11-25-2004
0.25
Test fit of ribs to rear spar
Details
     

 11-23-2004
1.00
Root Rib Attach Angles
Details
     

 11-21-2004
6.00
Root Rib Attach Angles
Details

 11-16-2004
3.00
Main Spar Details
Details

 11-14-2004
2.50
Main Spar Details
Details

 11-07-2004
0.50
EAA Technical Counselor Inspection
Details
     

 10-20-2004
2.00
Main Spar Details
Details

 10-19-2004
1.50
Main Spar Details
Details

 10-17-2004
3.00
Main Spar Details
Details

 10-14-2004
2.00
Main Spar Details
Details

 10-11-2004
1.50
Rear Spars Complete
Details
     

 10-10-2004
4.00
Rear Spars
Details

 10-03-2004
4.00
Rear Spars
Details
     

 09-29-2004
2.00
Rear Spars
Details

 09-28-2004
2.00
Rear Spars
Details

 09-27-2004
1.00
Rear Spars
Details

 09-26-2004
2.00
Rear Spar Details
Details
     

 09-23-2004
2.00
Rear Spar Details
Details

 09-22-2004
2.00
Rear Spar Details
Details

 09-21-2004
2.00
Rear Spar Details
Details

 09-19-2004
7.00
Fuselage Side Panels
Details
       

 09-16-2004
0.75
Drawing F26 complete (mostly)
Details

 09-14-2004
3.00
Longerons and Splice Plates
Details

 09-14-2004
2.50
Drawing F23 Complete
Details
     

 09-13-2004
2.00
Misc Fuselage Parts
Details
     

 09-08-2004
2.00
Fuselage misc parts
Details

 09-06-2004
5.00
Tail cone parts
Details

 09-01-2004
1.00
Misc Fuselage Parts
Details

 08-30-2004
2.00
Drawing F27 Complete
Details

 08-29-2004
1.50
Vertical Channel Construction
Details

 08-27-2004
1.20
Vertical Channel Construction
Details

 08-26-2004
1.00
Vertical Channel Construction
Details

 08-17-2004
1.50
Vertical Channel Construction
Details

 08-10-2004
2.00
Vertical Channel Construction
Details

 08-04-2004
2.50
Drawing F22 complete
Details

 08-03-2004
1.50
Aft shear web assembly
Details

 08-02-2004
2.00
Tail cone box misc parts - Drawing F22
Details

 08-01-2004
4.00
Completed parts on drawing SNX-F24
Details
     

 07-29-2004
2.00
Fuselage Cross Ties
Details

 07-28-2004
2.50
Upper Fuselage Cross ties
Details

 07-27-2004
2.00
Fuselage Cross Tie Box Beam Assembly
Details
     

 07-26-2004
2.00
Fuselage Cross Tie Box Beam Assembly
Details

 07-25-2004
3.00
Fuselage Cross Tie Box Beam assembly
Details
       

 07-22-2004
2.00
Unpacking and Organizing
Details
     

 07-07-2004
5.00
Worktable Construction
Details
       

 07-05-2004
1.00
Unpacking
Details
     