I have not been keeping up with my construction log over the last 10 days, so I am going to try and remember what I did and put it all in this one entry.I fabricated the pulley link for the brake handle and pretty much finished installing the brake cable and cable housings. I had to order the Azusa wire swivels to fasten the brake cable at the ends, but that will be it for the brakes once I get those installed. I have started installing the fuel tank. I have the rear fuel tank straps in place, but I still have to fabricate the forward straps. Last weekend I finished the control stick assembly and installed it in the fuselage. I now wish I had waited to do that because it is getting in the way when I have to do cockpit diving for the fuel tank installation. I also installed the mixer assembly in the tail section.