KitLog pro

Powered By Kitlog Pro v2.0

Joe & Steve's RV9A Project
< Previous Log Entry          Next Log Entry >
' style=
Date:  4-27-2018
Number of Hours:  0.00
Manual Reference:  
Brief Description:  test and configure panel and avionics

Spent the day testing all of the avionics and airframe electrical. Troubleshot a nd fixed a few minor issues. Although some items can't be tested yet (i.e. adsb, flap positioning, etc.) everything tested works. Lots to learn with this new Dynon system. Panel came back out to make some changes to the locations of a few items to make their connectors more accessible, and added a brace between the panel and sub panel near the throttle/mixture bracket to stiffen it up a bit, as operating the throttle was flexing the panel a bit. Secured throttle and mixture cables with adel clamps. Installed Manifold Pressure sender and wired it. Happy now with panel removal and installation logistics - 20 minutes to remove or replace.
' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.