KitLog pro

Powered By Kitlog Pro v2.0

Joe & Steve's RV9A Project
' style=
Date:  3-12-2018
Number of Hours:  4.00
Manual Reference:  
Brief Description:  gear leg fairings cont.

begin installation and rigging of gear leg fairings. Jacked up and leveled airframe in both axis and then hung plumb bob from points on HS, snapped a line perpendicular to the fuse center line. Will use this to established displaced centerline for aligning fairings and wheel pants with airflow. Test fit fairings.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.