KitLog pro

Powered By Kitlog Pro v2.0

Joe & Steve's RV9A Project
' style=
Date:  6-5-2017
Number of Hours:  3.25
Manual Reference:  
Brief Description:  prime emp fairing

shot epoxy primer followed by high build primer. VERY few pinholes, filled them with thickened high build primer. Repaired a fiberglass tape joint that did not take hold. Ready for final sanding and then another light high build coat, one more coat white epoxy primer then final paint coats.

Began masking VS and rudder, will paint these at the same time to maximize paint material and booth efficiency.
' style=

epoxy primer

epoxy primer

' style=

after high build prime

after high build prime

' style=

prep VS for prime/paint

prep VS for prime/paint

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.