I fitted the bottom stringer tubing and held it in place with string. I then measured and cut the standoff material. I secured the standoffs to the fuselage bushings using CCP42 rivets coated with Aerograde Joining Compound. I drilled the stringer material to fit the standoffs and installed them with Hysol adhesive