KitLog pro

Powered By Kitlog Pro v2.0

Johns Web Site
' style=
Date:  10-25-2014
Number of Hours:  4.00
Manual Reference:  Ch 1.3.3
Brief Description:  Bottom Stringer

I fitted the bottom stringer tubing and held it in place with string. I then measured and cut the standoff material. I secured the standoffs to the fuselage bushings using CCP42 rivets coated with Aerograde Joining Compound. I drilled the stringer material to fit the standoffs and installed them with Hysol adhesive
' style=





' style=




' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.