KitLog pro

Powered By Kitlog Pro v2.0

Johns Web Site
' style=
Date:  6-30-2016
Number of Hours:  3.00
Manual Reference:  Ch 1.22
Brief Description:  Header Tank

I had another set of boss' welded to the tank that puts the sight gauge between the tank and the right side of the fuselage.

I drilled and taped all the holes needed for feeding fuel to and from the tank. I installed all the hose fittings using Turn sealant. I have one extra hole drilled and taped that I will cover with a pipe plug just in case I ever need another fitting for a vent or something. It’s much easier to drill and tap it now rather than after it has been in service.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.