KitLog pro

Powered By Kitlog Pro v2.0

Baby Steps to an RV-8
' style=
Date:  4-8-2010
Number of Hours:  2.50
Manual Reference:  Sect. 6
Brief Description:  Rudder Stiffeners and VS Rear Spar

Finally wrapped up prep on the stiffeners. Had to trim each piece, sand it down on the belt sander, file edges, prep with sandpaper, and finally polish with Scotch Brite Wheel. After that I buffed them with the gray Scotch Brite pad in prep for priming. Took forever it seems, but kind of milked the job over the last week or two.

Vertical Stab Rear Spar: Reworked some rivets and cleaned things up a bit. Went over everything with the squeezer for uniform depths and consistency. Drilled four or five rivets and replaced using pneumatic squeezed rivets. As many folks have mentioned, I had to trim the rivets to fit better before squeezing. Otherwise some of them tend to squeeze over to one side. Will set the flush mount rivets tomorrow evening. Finally plan to reprime the spar once everything is riveted. That should clean things up a bit.
' style=

Stiffeners Buffed and Ready

Stiffeners Buffed and Ready

' style=

Rear Spar Partially Riveted

Rear Spar Partially Riveted

' style=

Lots of work went into these Stiffeners

Lots of work went into these Stiffeners

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.