Powered By Kitlog Pro v2.0
Jeff Mitchell's RV8 project
RV-8
Firewall Forward
8-14-2013
< Previous Log Entry
Next Log Entry >
Date:
8-14-2013
Number of Hours:
7.00
Manual Reference:
N/A
Brief Description:
Breather tube and fuel pump overflow.
I did some minor work on the oil cooler cross brace support, blast tube planning, ignition wire securing planning and installed both the engine case breather tube and fuel pump overflow tube.
Engine breather tube
Fuel pump overflow tube
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1018
4065
Ailerons
25
84
Avionics
64
344
Empennage
118
324
Engine
4
17
Firewall Forward
61
308
Flaps
11
51
Fuel Tanks
54
190
Fuselage
457
1889
Misc Pics
6
4
Miscellaneous
26
215
Pics of me building
6
4
Prop
2
11
Tools
12
10
Training Kits
8
24
Wings
153
557
Workshop Setup
11
33
Copyright © 2001-2024 Matronics. All Rights Reserved.