KitLog pro

Powered By Kitlog Pro v2.0

Jeff Mitchell's RV8 project
' style=
Date:  3-7-2011
Number of Hours:  4.50
Manual Reference:  N/A
Brief Description:  Ground busses, master and start relays - Part 1.

I removed the primer on the left and right hand upper longerons in preparation for mounting the ground busses. I used some Dow Corning Compound 4 between the mating surfaces and used Cherry Max structural rivets to install them. I wired up the master and starter switches, hooked up the battery and checked that both relays closed properly.
' style=

Longeron surface prepared

Longeron surface prepared

' style=

Ground buss installed

Ground buss installed

' style=

Master switch wired

Master switch wired

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.