KitLog pro

Powered By Kitlog Pro v2.0

Jeff Mitchell's RV8 project
' style=
Date:  6-28-2008
Number of Hours:  1.50
Manual Reference:  7-3
Brief Description:  Match drilled and deburred ribs to spars.

I match drilled all the holes between the nose and main ribs to the fore and aft wing spars. I used my 90 degree angle drill attachment from Avery to get to the outboard half. I think it cost about $150 but it's worth the money. I took everything apart and deburred the lot. I used a 12” extension on my 'el cheapo' cordless screwdriver to debur the in side holes of all the ribs. Next up is to Cleco things back together and decide where I will run my wiring conduit.
' style=

Deburring setup

Deburring setup

' style=

Avery 90 degree angle kit

Avery 90 degree angle kit

' style=

Model number

Model number

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.