KitLog pro

Powered By Kitlog Pro v2.0

Jeff Mitchell's RV8 project
' style=
Date:  9-11-2009
Number of Hours:  3.00
Manual Reference:  8-29, 8-30
Brief Description:  Andair fuel valve installation part 3.

I finished off the installation of the Andair fuel valve by drilling the necessary holes in the top faceplate F-881-1. I clecoed it into position and checked for alignment and valve operation. Feels like a proper valve and looks good too. I finished up by match drilling the two mounting brackets that will hold the fuel filter and the fuel pump.
' style=





' style=




' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.