Brief Description: Finished drilling forward side skins.
I finished drilling the upper longerons to the engine mount brackets and final drilled the remaining holes on the forward side skins. I opened up the specified holes at the base of the landing gear towers to No. 19. I step drilled from 1/8 to 9/64 to the final size of 19.