Powered By Kitlog Pro v2.0
Jeff Mitchell's RV8 project
RV-8
All
7-24-2009
< Previous Log Entry
Next Log Entry >
Date:
7-24-2009
Number of Hours:
4.50
Manual Reference:
8-26
Brief Description:
Drilled F-843 / F-844 Longerons.
I match drilled the F-843 and F-844 longerons on both sides of the fuselage. This process was time consuming but not as difficult as I had anticipated.
F-843 longeron drilled on right side
F-844 longeron drilled on left side
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1018
4065
Ailerons
25
84
Avionics
64
344
Empennage
118
324
Engine
4
17
Firewall Forward
61
308
Flaps
11
51
Fuel Tanks
54
190
Fuselage
457
1889
Misc Pics
6
4
Miscellaneous
26
215
Pics of me building
6
4
Prop
2
11
Tools
12
10
Training Kits
8
24
Wings
153
557
Workshop Setup
11
33
Copyright © 2001-2024 Matronics. All Rights Reserved.