Powered By Kitlog Pro v2.0
Jeff Mitchell's RV8 project
RV-8
All
7-9-2009
< Previous Log Entry
Next Log Entry >
Date:
7-9-2009
Number of Hours:
2.50
Manual Reference:
8-22
Brief Description:
Worked on aft tail cone bulkheads.
I removed the required portion of F-812A/C then final and match drilled the vertical stab attach bars. I also fluted between rivet holes on all tailcone bulkheads that required this.
F-811-1 Bulkhead assembly
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-8 Home
Category
# Logs
# Hours
All
1018
4065
Ailerons
25
84
Avionics
64
344
Empennage
118
324
Engine
4
17
Firewall Forward
61
308
Flaps
11
51
Fuel Tanks
54
190
Fuselage
457
1889
Misc Pics
6
4
Miscellaneous
26
215
Pics of me building
6
4
Prop
2
11
Tools
12
10
Training Kits
8
24
Wings
153
557
Workshop Setup
11
33
Copyright © 2001-2024 Matronics. All Rights Reserved.