Powered By Kitlog Pro v2.0
JAMES'S WEB SITE
RV-9a
Empennage
1-13-2006
< Previous Log Entry
Next Log Entry >
Date:
1-13-2006
Number of Hours:
14.00
Manual Reference:
6-7
Brief Description:
Frame construction.
Frame construction. Starting with the frame and finishing up with the trailing edge. The stiffeners were back riveted on and the small metal wedge trip was added.
Starting the frame
Getting the trailing edge straight
Final connection and adjustment
< Previous Log Entry
Next Log Entry >
SITE NAVIGATION
Contact Builder
RV-9a Home
RV-9a Home
Category
# Logs
# Hours
All
27
423
Empennage
12
205
Fuselage
11
156
Miscellaneous
1
20
Shop setup
1
14
Training
1
14
Training
1
14
Copyright © 2001-2024 Matronics. All Rights Reserved.