KitLog pro

Powered By Kitlog Pro v2.0

JAMES'S WEB SITE
' style=
Date:  3-1-2006
Number of Hours:  3.00
Manual Reference:  Pages 8-10
Brief Description:  Checking and building the Bell crank support

At this point the manual said to join the two fuse section together, but with the quick build kit this was already completed.
The Bell crank was assembled. This crank will be installed between the floor sections of the control line behind the seats to the back of the fuse. Bearing was riveted in place and primed.
' style=

Bell crank

Bell crank

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.