KitLog pro

Powered By Kitlog Pro v2.0

JAMES'S WEB SITE
' style=
Date:  1-13-2006
Number of Hours:  14.00
Manual Reference:  P 6-7
Brief Description:  finish up the Right Elevator

The Fraime was constructed, starting from the frame and finishing with adjusting the trailing edge. The frame was build. The stiffeners were backrivited on and the small wedge metal strip was added.
' style=

Starting the frame

Starting the frame

' style=

Getting the trailing edge strate

Getting the trailing edge strate

' style=

Adjusting the elevator

Adjusting the elevator

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.