KitLog pro

Powered By Kitlog Pro v2.0

Legacy N222BZ
< Previous Log Entry          Next Log Entry >
' style=
Date:  2-15-2005
Number of Hours:  45.00
Manual Reference:  Sec 1C
Brief Description:  Hangar work table construction.

I built all of these work tables based on plans provided by EAA Chapter 1. In all, 2 small work tables, 1 medium work table, 1 large work table, and 2 wing cradles were constructed.

All of the tables were sanded, holes filled and primed before the final paint was applied. I used a light gray color overall with a gunmetal color for the top surfaces. Castors will eventually be added to both of the small work tables and the wing cradles for ease of movement around the hangar.
' style=

Work table and wing cradle construction is complete.

Work table and wing cradle construction is complete.

' style=

Holes filled and primer applied to all tables.

Holes filled and primer applied to all tables.

' style=

Work table in final paint.

Work table in final paint.

' style=
< Previous Log Entry          Next Log Entry >










Copyright © 2001-2024 Matronics. All Rights Reserved.