KitLog pro

Powered By Kitlog Pro v2.0

Legacy N222BZ
' style=
Date:  3-23-2004
Number of Hours:  4.00
Manual Reference:  Sec 2E
Brief Description:  Elevator counterweight installation.

The elevator counterweights were trimmed, shaped and floxed into place in each elevator. Bulkheads were formed from a piece of 1/4" prepreg and installed 1/2" aft of the counterweights to provide a space to install more weight if required after the completed elevators are balanced. Once floxed in place, a 2 BID carbon layup was layed into the space between the weight and bulkhead. This carbon layup structurally reinforced the area to withstand additional weight.
' style=

Position of the left elevator counterweight bulkhead.

Position of the left elevator counterweight bulkhead.

' style=

Position of the right elevator counterweight bulkhead.

Position of the right elevator counterweight bulkhead.

' style=

Bulkhead constructed of 1/4

Bulkhead constructed of 1/4" prepreg.

' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.